A borehole displacement profile is calculated from the tilt and length of connected sensor segments. The right instrument therefore depends on the depth to be covered, the spacing needed to resolve movement, the expected water pressure and the way readings will be collected. A single accuracy figure is not enough to make the selection.

1. Set the depth and reference requirements

For slope monitoring, the borehole generally needs to cross the potential slip surface and reach a stable reference section. Establish that depth before choosing the sensor string.

The RT-1010 has a maximum combined length of 200 m with 50 cm segments, or 400 m with 100 cm segments. The RT-1015 Lightweight In-Place Inclinometer is recommended for depths up to 60 m, with a maximum of 100 m. The selection table below sets out the additional checks for deeper RT-1015 installations.

2. Match segment length to the deformation zone

Short segments give more detail where movement is localized, but increase the number of sensor nodes, connections and readings. Longer segments may suit the overall deformation trend in a deep borehole.

Choose spacing around the smallest zone that the monitoring design needs to resolve. Depth coverage and spatial resolution should be considered together.

3. Compare sensor accuracy and profile stability separately

Tilt accuracy describes an individual sensor. Displacement stability describes the accumulated output along the string. These specifications answer different questions.

The high-precision RT-1010 specifies 0.005° tilt accuracy and displacement stability better than ±1 mm per 50 m. The standard version specifies 0.05° tilt accuracy and displacement stability better than ±3 mm per 50 m.

4. Specify the water-pressure rating

The standard RT-1010 is rated to 2 MPa water pressure; a 4.5 MPa high-pressure version is available. Deep dam installations, underwater foundations and boreholes with high groundwater levels require a check of the expected pressure, seals and cable configuration before ordering.

5. Preserve a usable baseline

Record axis orientation, segment IDs, installation depths, initial readings and field photographs. Secure mounting, consistent sampling and temperature compensation help make later profiles comparable with the baseline. Nominal sensor accuracy cannot compensate for an unstable installation reference.

6. Choose between a connected profile and selected depths

Model Monitoring arrangement What to confirm
RT-1010 Array Displacement Meter Connected sensor string for displacement, settlement or convergence, according to the installation arrangement Coverage, segment length, accuracy version, water pressure and optional functions for the required measurement
RT-1015 Lightweight In-Place Inclinometer Segments assembled on site for displacement and tilt in shallow-to-medium-depth boreholes Installation weight and depth; recommended up to 60 m, maximum 100 m. Beyond 60 m, confirm power, communications and installation conditions
RT-1020 In-Place Inclinometer Fixed sensors at selected depths; horizontal displacement analysis uses tilt readings and sensor spacing Selected layers, spacing, mounting and the baseline reference for long-term monitoring

Compare the RT-1010 and RT-1015 when a connected string along the borehole is required. Consider the RT-1020 for observations at selected depths. In each case, the ground conditions, potential slip surface and expected movement determine the measurement layout.

7. Prepare the project information

For a selection review, bring the following information:

  • Monitored structure, borehole depth and diameter, and geological information
  • Expected deformation zones and directions, with the required measurement spacing
  • Groundwater conditions, expected pressure and mounting arrangement
  • Available power, communications, reading interval and system interfaces

The Shuangjiangkou dam monitoring case describes one project installation. Send us these details for a selection review.